Location: SIA: Spokane, WA
General Contractor: Lydig Construction
Budget: $680,000.00
Scope of Work: Dom. CW, HW, HWR, & Misc. Plumbing, Gas Piping, W&V, Mechanical/Hydronic Piping, Radiant Floor, Trench Drain, Lubrication System, Trench Drain and Mass Drainage, Radiant Heating, Snow Melt, Compressed Air System & Piping